The Dance Studio
This project removed interior partition walls in a commercial office space. This is the office.
The Dance Studio
The coat closet before removal.
The Dance Studio
The wing wall before removal.
The Dance Studio
The removed office. Careful work allowed the moving and reuse of the electrical. Walls have been patched and skim coated. Patches were also cut into the vinyl cove base.
The Dance Studio
This is the demo before removal by Mad Dog Demolition. Wood, plaster, and metals are separated to recycle as much as possible prior to proper disposal.
The Dance Studio
A twenty four foot wall of mirrors with custom top and bottom millwork.
The Crevice
This is almost two yards of concrete, placed by half five gallon bucket. A tight squeeze, but worth the effort for a happy customer.
The Crevice
No one imagined what was in there. Eight bags of awful, two tires, saplings, a steel door frame...
The Crevice
This long, tapering area was filled with years of trash and allowed rats to tunnel into the building on the left.
The Recording Studio
Before applying a three coat drywall system. This studio is designed to the latest specifications, including multiple wall layers and a floating floor.
The Recording Studio
This is the isolation room. High, angled ceilings make for challenging work.
The Recording Studio
After. A meticulous installation, a highly enjoyable project.
The Recording Studio
After. The isolation room.
Doggy Day Care
This is the beginning of a ten foot by ten foot opening between two commercial rental units. K9 Sublime, a prestigious dog services provider, expanded operations with this project.
Doggy Day Care
The opening was through a load bearing wall. Great effort was taken to ensure no part of the building was compromised. This shows the temporary support wall and the slot cut for the massive beam in the foreground.
Doggy Day Care
The beam is in place and the wall is coming down. This project tripled the size of K9 Sublime's operation. Another happy customer.